PIPING / P&ID,PFD/STEEL STRUCTURE
PIPING / P&ID&PFD/STEEL STRUCTURE
P&ID (Piping and Instrumentation Diagram), PFD (Process Flow Diagram) : In the case of the relevant workplace, such as new and extended projects including chemical processes, basic consultations on processes, process safety reports, outdoor impact assessment, integrated environmental management plans, etc , P&ID and PFD are required for preparation for licensing, layout of process equipment, construction layout, etc, and if the connection point of the utility required for the process is required, P&ID and PFD are required. TEST BED : TEST BED refers to the environment, space, systems, facilities (facilities) to test the performance, effectiveness, stability, mass production possibility, convenience, etc. of various new technologies and prototypes developed by companies, laboratories, and universities. At SEOEUN PLANT TECH Co., Ltd. , we have a lot of experience in designing testbeds and we can give you ideas that no one can think of. PIPING : It refers to all construction piping such as UTILITY and PROCESS PIPING LINE, and all piping designs are carried out for various projects. STEEL STRUCTURE : The purpose of this project is to improve design quality by considering the weight of pressure vessels, conveyors, various gas pipes, PIPE RACK, CABLE TRUSS, SUPPORT spporting them, and external loads such as earthquake, wind, vibration, and thermal expansion. Our company provides efficient configuration, layout, and design for the field. |
|
Click to download the file |
Copyright ⓒ Seoeun plant tech All rights reserved.